Neither two drop wires, or even one, will be required as for this short distance battery power will be used.
Seriously folks, I want the new service to be underground and have dug a trench on my own property up to the boundary with the private road. On the opposite side of the road is the BT pit where the new SOGEA circuit has finally got to.
This new build replaces a property which was demolished but the location is part of a CFP which will see FTTP arriving towards the end of the year.
In this currently open trench, I want to place ducting that will be suitable for both the initial SOGEA service and later for fibre. What is the speciation of the ducting to use to meet Openreach's requirements?