Well after a few weeks of slow speeds and various forum members playing diversion tactics, Idnet finally broke silence last weekend and admitted their system was at fault due to one pipeline (presumably GW5)being over capacity.
To be fair to Tim, Simon and the team at Idnet their promised balancing act over the last few day's has resulted in a marked improvement although not 100% of previous months.
Unfortunately for Idnet moving resources from one pipe to another has confirmed fears that their network is almost full to capacity and until BT supply a backordered increase (latest date Nov 2008), load balancing and reduced speeds may continue for the forseeable future.
Whilst at present I personally consider the load balancing to be achieving satisfactory results I am not convinced the introduction of a new BT Host link and ADSL2+ will have an immediate effect as related by IdNet, this alway's presuming the November delivery date is adhered to by BT.
Even If BT stick to their promised slow rollout of ADSL2+ exchanges only a limited number of users will migrate before April 2009 releasing capacity on the existing network.
For myself monitoring of speed will continue, but as related in previous posts, the logistics of the service is the ISP'S problem, users pay for a service expecting results not excuses or the blame game.
A copy of the latest update post from Simon at IdNet is pasted below;
03/09/08 15.59pm
We are still working at re-balancing our Centrals. The BT systems are supposed to do this automatically but they don't seem to be very good at it.
The root of the problem is that we are nearing the limits of our capacity. The iPlayer traffic during the Olympics brought this to a head. We would normally have had a new BT Central installed by now. Back in April we placed an order with BT for a 1Gbps 21CN (21st Century Network) WBC Host Link (the next generation of BT Central). The official lead time is 65 working days. We have now received an install date of 4th November = 180 working days!
This time last year BT said that IP Stream traffic (i.e. all traffic on the current ("old-style") BT Centrals) would be migrated to the Host Link "at launch". When the product was "launched" (I put that in quote marks due to the install delay shambles mentioned above) in April they then said that the migration could take place by Christmas. The latest timing that we have been given is "March". We will though be able to upgrade customers to ADSL2+ (those who are connected to upgraded Exchanges) as soon as our Host Link is installed.
In the meantime we will be working hard to get the balancing right.
Simon