Looks more like duct unblocking and installs for now. The Mustang works will be some OLTs and power pedestals usually near existing cabinets and a small access network cabinet next to almost every existing one. Can start slow with some unblocking and subduct install before the main work though.
I forgot to reply here, not sure if was actual mustang work, most of the dots vanished within a day or two, and the one's I checked didnt have fibreup in the reference. Instead they all were/are EMID