General Discussion
  >> Fibre Broadband


Register (or login) on our website and you will not see this ad.


Pages in this thread: 1 | [2] | 3 | (show all)   Print Thread
Standard User Kr1s69
(knowledge is power) Sat 21-Apr-12 08:45:58
Print Post

Re: Phase 9a


[re: Aaron_01] [link to this post]
 
June 2012 was the original target for 8a. Those with a phase lower than 8a with a date of June 2012 would suggest that they were planned to be active earlier but have slipped.

17a is not a phase, but relates to the frequencies used by the modem.

Kris

Sky Broadband Unlimited
Ashington (Northumberland) Exchange
Fibre due June 2012!
Standard User simon194
(regular) Sat 21-Apr-12 10:48:52
Print Post

Re: Phase 9a


[re: Kr1s69] [link to this post]
 
In reply to a post by Kr1s69:
June 2012 was the original target for 8a. Those with a phase lower than 8a with a date of June 2012 would suggest that they were planned to be active earlier but have slipped.

I'll confirm that, my area is is a phase 7b area and it's slipped to June 2012. Looking at the number of cabinets that are there that have big holes around them for the last 4-6 weeks with no evidence of any work taking place, it's probably going to slip again.
Standard User deleted
(deleted) Sat 21-Apr-12 11:05:17
Print Post

Re: Phase 9a


[re: simon194] [link to this post]
 
In reply to a post by simon194:
In reply to a post by Kr1s69:
June 2012 was the original target for 8a. Those with a phase lower than 8a with a date of June 2012 would suggest that they were planned to be active earlier but have slipped.

I'll confirm that, my area is is a phase 7b area and it's slipped to June 2012. Looking at the number of cabinets that are there that have big holes around them for the last 4-6 weeks with no evidence of any work taking place, it's probably going to slip again.


Same here. I`m on the border of two towns (Bromborough/Eastham) both announced as phase 7 back March 2011.

Mine, Eastham was then announced again, this time as phase 8a (for June 12)
Bromborough was enabled last month (March).

For mine, samknows previously showed dates of Sept 11, Dec 11, March 12, June 1st and now June 30th 2012. There are some signs thats its on its way though with BT's red paint DSLAM next to where the new cabs will go.


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Sat 21-Apr-12 12:57:01
Print Post

I Can Beat That - Phase 5b


[re: deleted] [link to this post]
 
Still not done, no new cabinet constructed yet.

Not that Openreach are behind schedule or anything, honestly.

The problem is they are being very careful to state that they have enabled exchanges passing x number of homes, rather than stating the actual amount of homes the fibre network passes. That would be a considerably lower number.
Standard User deleted
(deleted) Wed 11-Jul-12 19:21:32
Print Post

Re: Phase 9a


[re: deleted] [link to this post]
 
Finally some activity today; Openreach have dug up at the road next to some cabs round here. (passed 5 cabs on my travels and 3 had roadworks). There is grey tubing sticking out of the ground ready for the new cabinet.
Standard User deleted
(deleted) Fri 13-Jul-12 14:11:13
Print Post

Re: Phase 9a


[re: deleted] [link to this post]
 
Saw a loader full of new cabs near by, hopefully when I get back they will have done mine too.
Standard User RobertoS
(sensei) Fri 13-Jul-12 18:31:25
Print Post

Re: Phase 9a


[re: deleted] [link to this post]
 
Might have been someone nicking them.

My broadband basic info/help site - www.robertos.me.uk
My domains,website and mail hosting - Tsohost. Internet connection - Plusnet Value Fibre 80/20 trial.

"Where talent is a dwarf, self-esteem is a giant." - Jean-Antoine Petit-Senn.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Standard User iand
(experienced) Fri 13-Jul-12 21:52:08
Print Post

Re: Phase 9a


[re: deleted] [link to this post]
 
same here for 9a. Hope this is completed in a few weeks. Have mid-end aug in sight....

IanD
Standard User deleted
(deleted) Sat 14-Jul-12 09:17:55
Print Post

Re: Phase 9a


[re: deleted] [link to this post]
 
Passed 6 cabs yesterday, 4 of them have had new ones installed, 3 of them need the pavement tidying up still. The other 2 just have the red BT paint by them so they could be ones they come back to later on. The one I think I am on (the one I am closest to anyway) has been done. Will wait for power and accepting orders now smile
Standard User deleted
(deleted) Sat 15-Sep-12 09:35:09
Print Post

Re: Phase 9a


[re: deleted] [link to this post]
 
OK a little update....

They dug up the road to connect the power to all of the cabs 2 weeks ago. On Monday the BT Checker finally showed a date of Sept 30th for my exchange.

Wednesday the power went live and Friday the BT checker updated to show available (the when where site still shows coming soon).
I placed an order Friday am and the earliest slot is Oct 2nd.

Edited by deleted (Sat 15-Sep-12 09:36:17)

Pages in this thread: 1 | [2] | 3 | (show all)   Print Thread

Jump to