Where the manifolds are in place, it should be pretty much ready to go. Engineer installs BFT from the manifold to the CSP, then blows fibre from the DP to the CSP. Two splices, one at the DP and another at the Splitter node, then a second visit for the actual install from CSP to ONTE.