I am in an area served by a cabinet which apparently has a lot of 'profile' on it, however it's proving tough to get any specific information.
There appears to be no schedule at all for it beyond that it'll be complete by the end of the year. Is it normal for there to be 4 months to go and there still to be no plan of works to build out a cabinet?
Hunslet / MYHLT 82 is being watched by a number of people locally and from BT at a national level so it would seem odd if there are still no construction plans or timescales for when this beast is scheduled to go in.
Anyone reached out to NGA Enquiries, etc, and been unable to get information this close to enabling time?