Hi all,
Over Summer '13, a green cabinet box was installed. Then the power. After that, nothing was happening.
Then got the 'going live' date of Dec '13. Great, I thought.
Until... 2 days ago, a hole was dug up next to the new green cabinet box. Then the cables put in place. And a new green cabinet was placed next to each other!
Is this normal? Could it be because they fitted a smaller one and realised that they should have fitted a big one? Or is it being used for something else?
Don't have a pic yet as it was raining at that time. So I thought I'd post here to find out.
Thanks all,