Works description: Huddersfield (Pcp 154)Street Cabinet & Power Installation. Excavate To Lay Approx 3m Bt Ducts In F/Way, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 5m Duct In F/Way. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site.
Responsibility for works: BT
Current status: Planned work about to start
I understood that to mean that the FTTC cabinet would be installed imminently. All the usual barriers etc were erected, and there was some activity during the first day. Then for the remainder of the week there was hardly any activity at all, until the last day, where all the barriers were removed, and no FTTC cabinet.
Similar work was going on the same road towards Huddersfield Town Centre, and the cabinets near to the centre have a FTTC cabinet. However, there are a few other cabinets on the same road that haven't yet been upgraded before cabinet 154 and it could just be that Openreach will enable cabinet 154 later.
What's worrying me is that there maybe issues with cabinet 154 and it may be excluded from the FTTC rollout.
Has anyone had similar experience with their cabinet?



Print Thread