I have just seen a big reel of what I think is fiber cabling? Its black with at least 2 yellow stripes on it.
There is also the following on roadworks.org:
Haydock Close, Leeswood, Flintshire
Works Start: 13 Jan
End: 21 Jan
Low impact, delays unlikely
Location : (PCP6) OPPOSITE SIDE OF 1 LLWYN GOODWOOD CROSSING CARRIAGE WAY TO SIDE OF 1 ON HAYDOCK CLOSE PONTYBODKIN, FLINTSHIRE CH7
Description : Install 3m of 1 way poly duct in Footway,Install 5m of 1 way poly duct in Carriageway,Install 9m of 1 way poly duct in Verge,Provide 1 Provide/Recover 1 NGA Cab and base (1.5m x 0.5m)
Current status: Planned work about to start
Traffic lights, etc: Traffic control (give & take)
That is for a cab up the road from me. I am connected to the first cab from the exchange witch is at the other side of the village but there is a tone of room on the path so I don't imagine they would need traffic control and thus not listed on roadworks.org?
I am I getting excited over nothing?? I sure hope not!
TalkTalk 24Mb
Current Line Status
Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB
Current Line Status
Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB



Pages in this thread:
Print Thread
Seansmit17