Is it possible to find an engineer schedule for BTO cabinet upgrades? I'm trying to find out when, or if cabinet 6 on LCAMB is due to be upgraded, I believe the work is being done under the Connecting Cumbria Scheme.
Unfortunately they're not releasing any info about the specific cabs to be enabled, only the list of already enabled cabs as I'm sure you're aware. The Ambleside exchange is due to be enabled by end of June so hopefully the wait won't be too long!
Register (or login) on our website and you will not see this ad.