Hi there,
I see this site is a wealth of information, so was wondering if someone could offer any further information. I live approx 100 metres from the Crediton exchange (WWCRED) and subsequently have an Exchange Only line.
In June, a new PCP appeared outside the exchange, then in September a fibre twin was installed on the road just opposite the cabinet. There has been sporadic work on and around the cabs, since June, and a number was finally painted on the new PCP cab last week - It is Cabinet 8.
Having checked with Connecting Devon and Somerset, they gave the usual response that Exchange Only lines will be dealt with at the backend of the project, but once I re-iterated that the cabs were in place, they checked again and they suggested that network re-arrangement was being carried out and to expect the cab to go live April/May 2015.
Just wanted to see what the process of moving an EO line on to cabinet - i.e. would I move on to the PCP then at some point later the FTTC would become available, or would they wait until everything was ready to go, then move me on to a cabinet?
I can't find any information on the available dates for FTTC for Cabinet 8 anywhere, nor am I 100% sure that my line will end up being moved, but any further information would be appreciated.
Many thanks.



Print Thread
