I know it was the combined speed that's why I said that in my other reply, I think it might be the sync speed, I was more interested in the customization of it, like say one day I was doing YouTube content creation that required a larger upload stream bandwidth I would just set it as say 700Mbps up and 200Mb down (900Mbps package for my length of copper line being about 60m) and one the upload was complete I would swap them round.
Or if the 900Mbps package was a bit on the pricy side I could choose a 360Mbps package where 330Mbps down and 30Mbps up and so on.
I think BT might be thinking of doing the exact thing with FTTP later on where we can choose a combined speed and configure it as we would like it.
So if a content creator we might favour the upstream a little more etc.
Paul



Pages in this thread:
Print Thread
