Not in a good way.
Residents connected to Bedford (SMBF) 49T, ~100 people, have consistently been left in the dark and frustrated. This is due to the complete inadequacy of OpenReach/BT to provide, sensible, information regarding the upgrade to superfast/fibre
A little history:
Circa 2010 Exchange was enabled for fibre - dates for FTTC constantly moved back since
March 2013 - FTTC cabinet erected
August 2014 - Informed by OpenReach that the FTTC cabinet construction was a mistake
March 2015 - Batteries changed in the FTTC cabinet
August 2015 - coeff 96 fibre installed in cable chamber at 49T
August 2015 - cabinet 44T enabled for FTTP, under BDUK even though 70% connected to cabinet can get VM. Installation to houses connected to 44T happening from 49T!!
January 2016 - OpenReach 'When can i get fibre' updated to show 'In Scope'
January 2016 - 40 residents sign up to 'No one left behind'
April 2016 - OpenReach cannot provide any update on 'No one left behind'
May 2015 - OpenReach 'When can i get fibre' updated to 'Connect'.
Just been told that this last update is 'erroneous'!!!
Can anyone here get information as to what is actually happening? Or let me know who/how I can obtain the information?
Thanks
Satpal