Interestingly the pole that feeds the properties has the same equipment as the rest of the road (the connector blocks wired in). Which leads me to think that it may actually be ready but someone has forgotten to press a magic button.
Is there any way to check or perhaps one of the gurus on this forum could nudge Openreach?
Edited by deleted (Mon 10-Jun-19 19:55:24)



Print Thread
