Been trying to find out if there is any time line / steps for FTTP installs, e.g. DP's get added, cables gets laid, etc. Can't seem to find out any information and what information there is fairly old.
Just out of my own techie curiosity just wanting to know the next steps. They already have laid the fiber to the main pole, put up the Fiber DP's (Black Eggcups) at the top of the poles along with transition joints added, which seem to have fibre connected. Are there any other physical on street stages other than run the fibre between the poles from the transition joint poles?
We only found out a couple of weeks ago we are getting FTTP via BDUK when we asked one of the Openreach hoard working on the poles in a neighbouring street. Should have guessed something was up as Openreach have been pulling new fibre our way for months in the main duct, just assumed as we already had FTTC (but with really poor speeds) we would be decades away for FTTP.