Hello
I was wondering if the collective wisdom can provide some ideas. Here are my details.
I'm a homeowner in an Edinburgh Multi-Dwelling Unit in which Openreach is willing to install fttp backbone access, (they'll install to hallway utility cabinets on each floor). There are also other owners in the building who would like fftp access.
Openreach require permission to do the installation and the Factor is being reluctant to say the least.
I have the support of my buildings committee in allowing Openreach access but am unsure if they can override an obnoxious Factor. Any suggestions on how to deal with a fractious Factor?
Thank You



Pages in this thread:
Print Thread
