I can a successful FTTP Community scheme with Openreach. Been loads of work going on over last 6 months but today this box was installed at the front of my property. Does this mean its almost ready? Anyone got any experience of how long it becomes available on the checker once this box is installed?
Box
Engineer working



Pages in this thread:
Print Thread
kingbiscit