Over the past couple of months all our overhead cables have been replaced with fibre with CBT's on the pole outside my house. We are in a rural location and have been dealing with slow ADSL (3-6mbps) since we moved in.
A few weeks ago a Morrisons Telecoms engineer chapped the door to say he was working on our property and I took the chance to ask him when the lines were going live. He said the lines were 'lit' and I should be able to order fibre once Openreach had commsiioned them and signed them off.
How long does this nornally take? As I said its been a few weeks since the last activity in the area and I have 2 impatient boys (and me) waiting to get some online gaming fired up!
For anyones reference we are on the Chapelton exchange WSCHN, ML10 6TX