Did anyone ever find out if they link multiple cabinets together?
According to the checker using our phone number we're due to to get fttc at the end of March.
After speaking to an engineer I believe our cab is about 200 yards away and hasn't been upgraded yet however there is another cab that is also about 200 yards away from us and about 100 yards away from our cab that was upgraded in December.
They might have had to delay our cabinet upgrade due to the snow as the original go live date for us was supposed to be the end of Dec.
Edited by StuB (Tue 01-Feb-11 17:13:50)