At least they've updated the info for Highams Park now. The last version of the doc still said Sept 2010, whereas at last check with Dave @ PlusNet, the trial wasn't due to start until at least early December 2010
Now says "Accepting CP orders now"
There was a load of digging along the road which runs horizontal to mine this morning ( I know the fibre runs along here), so think there may be some investigation needed over the weekend
Edit: Just been for a quick walk albeit in the dark. All the evidence left now of any digging is new patches of tarmac about every 100 yards in the middle of the road. I also noticed the cab across the road from me near the pole has disappeared and there is a double manhole in it's place right next to the pole. I still also have a cab at the end of my road on my side backing on to the end-of-terrace house there - no markings on this one whatsoever from what I can see, so could be a VM cab.
The cab disappearing could be why my sync has been a bit higher than of late, but I've no idea when the cab went
OR engineer had previously told me I am connected to the cab to the right of the pole across the road
Be* Unlimited
Edited by nredwood (Fri 14-Jan-11 22:02:54)