Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
That moves back just by a quarter each time, showing the end of the quarter in which they anticipate go-live. BT's anticipated date for Hereford is August.
Standard User zyborg47
(eat-sleep-adslguide) Tue 26-Jun-12 18:40:01
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
i knew that would happen, not bothered to be honest, Thursday if all goes well I will be off wired broadband,

Adrian

Desktop machine now powered by windows 7 pro 64bit , laptop by ubuntu

On ADSL24 using C&W network.
Anonymous
(Unregistered)Tue 26-Jun-12 22:32:22
Print Post

Re: FTTC Hereford


[re: zyborg47] [link to this post]
 
I'm sure others will be interested though - . first wave of cabinet installs scheduled starting this week:

Openreach BT Abbots Mead Road Hereford U73243 Erect BT cabinet Opp. Romsey Drive 29/06/2012
Openreach BT Beattie Avenue Hereford U82015 Erect BT cabinet Jnct. Golden Post 28/06/2012
Openreach BT Belmont Road Sr Hereford U82100 Erect BT cabinet No.205 27/06/2012
Openreach BT Brampton Road Hereford U82141 Erect BT cabinet No.1 28/06/2012
Openreach BT Golden Post Hereford U82009 Erect BT cabinet Jnct. Beattie Avenue 28/06/2012
Openreach BT Hunderton Avenue Hereford U82002 Erect BT cabinet Near roundabout 27/06/2012
Openreach BT Kilpeck Avenue Hereford U82144 Erect BT cabinet Opp. No.27 28/06/2012
Openreach BT Oban Way Hereford U82124 Erect BT cabinet Jnct. Waterfield Road 29/06/2012
Openreach BT Raglan Place Hereford U82145 Erect BT cabinet Jnct.Kilpeck Avenue 28/06/2012
Openreach BT Southolme Road Hereford U73423 Erect BT cabinet Jnct. Eastholme Road 29/06/2012
Openreach BT Stanbrook Road Hereford U73265 Erect BT cabinet Jnct. Oulton Avenue 29/06/2012
Openreach BT Walnut Tree Avenue Hereford U82204 Erect BT cabinet Side of No.108 Ross Road 27/06/2012
Openreach BT Waterfield Road Hereford U82113 Erect BT cabinet Jnct. Oban Way 29/06/2012

and more ducting works

Openreach BT Escley Drive Hereford U82219 BT ducting works Side of No.2 Home Lane 28/06/2012
Openreach BT Hinton Road Hereford U82323 BT ducting works Jnct. Cumbrae Avenue 27/06/2012
Openreach BT Hoarwithy Road Hereford C1261 BT ducting works No.124 26/06/2012
Openreach BT Holme Lacy Road Hereford C1268 BT ducting works No.42 26/06/2012
Openreach BT Holme Lacy Road Hereford C1268 BT ducting works Opp.No.109 26/06/2012
Openreach BT Holme Lacy Road Hereford C1268 BT ducting works No.161 St.Clares 26/06/2012

these are the estimated start dates


Register (or login) on our website and you will not see this ad.

Anonymous
(Unregistered)Tue 26-Jun-12 22:52:47
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
thnaks for the infor my cab is number is 73 and there is a 73a so will they upgraded the both or just upgraded the cabel to the 73a one dose any one know
Anonymous
(Unregistered)Wed 27-Jun-12 11:03:57
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
where did u get the datas from
Anonymous
(Unregistered)Wed 27-Jun-12 13:06:29
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
August target date from asking the right person at BT. Cab install data from the council's streetworks spreadsheet which gets updated roughly once a week,

http://www.herefordshire.gov.uk/transport/road_path_...

Notice 3 sets of people pulling stuff and messing in manholes earlier.

Perhaps it's all steam ahead now.
Standard User zyborg47
(eat-sleep-adslguide) Wed 27-Jun-12 22:00:01
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
In reply to a post by Anonymous:
I'm sure others will be interested though - . first wave of cabinet installs scheduled starting this week:


Never said I was not interested, just not bothered. i am still interested to see if it happens.

Off topic, but I still see from the list that that silly bull is still going to go up in high town.

Adrian

Desktop machine now powered by windows 7 pro 64bit , laptop by ubuntu

On ADSL24 using C&W network.
Anonymous
(Unregistered)Thu 28-Jun-12 12:57:34
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
hiya did allpay come today what speed have u gone for
Anonymous
(Unregistered)Thu 28-Jun-12 14:57:44
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
Anyone seen any cabs starting to be installed? Great to see all the first wave cabs are south side!!!
Anonymous
(Unregistered)Thu 28-Jun-12 19:39:10
Print Post

Re: FTTC Hereford


[re: Anonymous] [link to this post]
 
I've seen ducting works on the A49 yesterday and Holme Lacy Road today. The only cab on the list I would see on my route through is at walnut tree avenue, but nothing happening there yet. There was an open reach van connected to what looked like three sets of fibres from "down a manhole" up the road from there though.