Re: FTTC Progress Against Schedule


[re: deleted] [link to this post]
 
well my area had the 3 month push back but this week openreach have been working on my street.

The cabinet for my phone is about 100-150m away, but they put a new FTTC cabinet across the road from me maybe 5-10m or so distance.

given the new date is now dec 2012, is it likely I can order early?
Standard User deleted
(deleted) Wed 25-Jul-12 19:22:53
Print Post

Re: FTTC Progress Against Schedule


[re: Chrysalis] [link to this post]
 
The only date you will know is the date when you can place and order . Any other date is indicative and can be pushed back or brought forward.
Standard User Kr1s69
(knowledge is power) Wed 25-Jul-12 19:45:06
Print Post

Re: FTTC Progress Against Schedule


[re: Chrysalis] [link to this post]
 
Is the FTTC cab definately twinned with the existing cab your on? They seem quite a distance apart!

Our FTTC cab was installed in April i think and we're still waiting with the checker showing September rather than the original June.

I would say you're now on track for December.

Kris

Sky Broadband Unlimited
Ashington (Northumberland) Exchange
Fibre due June 2012!


Register (or login) on our website and you will not see this ad.

Standard User Chrysalis
(eat-sleep-adslguide) Wed 25-Jul-12 20:03:23
Print Post

Re: FTTC Progress Against Schedule


[re: Kr1s69] [link to this post]
 
I asked the workmen and they said its to lower the copper length as the estate opposite me has horrific copper lengths, there is also a new cabinet next to the phone cabinet as well.

its possible it may be twinned with the new phone cabinet that was put in a side street near me that was fed with ali cables (posted few years back on this) as now I think about it I have not noticed a new cabinet near that one.

Edited by Chrysalis (Wed 25-Jul-12 20:04:39)

Standard User deleted
(deleted) Thu 26-Jul-12 16:01:36
Print Post

Re: FTTC Progress Against Schedule


[re: Kr1s69] [link to this post]
 
BT are still falling a very long way behind schedule If you have a Dec date Q2 2013 is more realistic so far out of the 190 Sep exchanges only about 15 have been enabled
Standard User deleted
(deleted) Thu 26-Jul-12 17:38:12
Print Post

Re: FTTC Progress Against Schedule


[re: deleted] [link to this post]
 
Rollout countiues till 2014 and any dates are estimates till then, if any work continues past 2014 then its late.