General Discussion
  >> Fibre Broadband


Register (or login) on our website and you will not see this ad.


Pages in this thread: 1 | 2 | 3 | 4 | 5 | 6 | 7 | [8] | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | (show all)   Print Thread
Standard User deleted
(deleted) Wed 01-Aug-12 14:35:39
Print Post

Re: Hereford PCP & FTTC Cabinet Map


[re: deleted] [link to this post]
 
It will be fine. look at east of the City, they look like they are being left to last.

Sheridan road gone green by the way. There they have sited the cab quite away from the PCP, presumably because of it's proximity to private land belonging to the near by flats.

Yes I was sad enough to divert and look there this morning.
Standard User deleted
(deleted) Wed 01-Aug-12 14:51:37
Print Post

Re: Hereford PCP & FTTC Cabinet Map


[re: deleted] [link to this post]
 
Well I wouldn't worry but after you said 3 are being left out and someone else mentioned potential problems with the company who's land the pcp lives, it is a bit scary!
Standard User deleted
(deleted) Wed 01-Aug-12 21:06:37
Print Post

Re: Hereford PCP & FTTC Cabinet Map


[re: Anonymous] [link to this post]
 
cab 48 is now instailed


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Wed 01-Aug-12 21:09:42
Print Post

Re: Hereford part two


[re: deleted] [link to this post]
 
so some one tle me what they doing for broadband down rotherwas id they art doing the cabs down there they need it down
Anonymous
(Unregistered)Wed 01-Aug-12 22:27:47
Print Post

Re: Hereford PCP & FTTC Cabinet Map


[re: deleted] [link to this post]
 
Door 119
Standard User deleted
(deleted) Wed 01-Aug-12 23:25:32
Print Post

Re: Hereford PCP & FTTC Cabinet Map


[re: Anonymous] [link to this post]
 
The unlucky postcode is HR2 7JH

If your postocde is HR2 7JJ you have a small chance.(22%)

Put your phone nymber in to the grey box half way down on the right:

http://www.productsandservices.bt.com/consumerProduc...

to find out
Standard User deleted
(deleted) Wed 01-Aug-12 23:25:59
Print Post

Re: Hereford PCP & FTTC Cabinet Map


[re: deleted] [link to this post]
 
updated on map
Standard User deleted
(deleted) Thu 02-Aug-12 14:50:05
Print Post

Re: Hereford part two


[re: zyborg47] [link to this post]
 
new cab in at belmont number 96
Standard User deleted
(deleted) Thu 02-Aug-12 15:22:00
Print Post

Re: Hereford part two


[re: deleted] [link to this post]
 
In to August now, what will be done to the upgraded cabs in order for them to go live? Seen western power around a few cabs but does that take a while to implement once they start, or is it like a couple of days per cab?
Standard User deleted
(deleted) Thu 02-Aug-12 15:30:58
Print Post

Re: Hereford part two


[re: deleted] [link to this post]
 
Power to a cab depends on the nearest local power source, usually they dig a trench in between the source and cabinet and put the ducting/cable in.
A second vist is to then connec the cabinet to the power source, this can be over a few days or weeks.

Here is a guide to a FTTC cab install.

http://beusergroup.co.uk/technotes/index.php?title=D...
Pages in this thread: 1 | 2 | 3 | 4 | 5 | 6 | 7 | [8] | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | (show all)   Print Thread

Jump to