Some questions -
1 When I get fibre I will have a new (larger) master socket fitted?
2 I assume the new master will be connected to a Modem which is then connected to a Router with Cat 5 cable?
3 Will both the Modem and Router need power but not the Master socket?
4 How far can the Modem and Router be away from the Master and what cable is used to connect?
5 Are OR engineers able to (allowed to !!) move the current Master and if so what are the likely limitations?
Grateful for any advice
Thanks
Edited by mikegg (Wed 03-Oct-12 13:21:20)



Print Thread
