I presume by not having working fibre, they mean that it's not up & running.
FTTC cab was installed last March, & duct dug in, over a couple of days.
There was an Openreach gang installing sub duct / blowing fibre at about the same time, but atleast one other fibre cab is fed via the same E side duct route, so may / may not be for my cab. The other cab has been up & running for a few months now.
As I look a the cab each day from my bedroom (just down the road about 50 - 75 yards), I haven't seen any contractors doing the power feed, & the only new tarmac is to the Openreach footway box.



Pages in this thread:
Print Thread
deleted

