Standard User deleted
(deleted) Wed 20-Feb-13 10:32:11
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
CAB 30 has been in place for nearly 2 weeks now, was wondering how long it will be before I can order??
Standard User deleted
(deleted) Wed 20-Feb-13 16:25:23
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
Same issue with cab 71 - cab installed but no fan noise comming from it.
Standard User simon194
(committed) Wed 20-Feb-13 19:13:02
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
In reply to a post by megagit:
CAB 30 has been in place for nearly 2 weeks now, was wondering how long it will be before I can order??

From experience anything from a few weeks upwards. The one I'm connected to in Hastings was installed at the beginning of April last year and went live in the middle of November.


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Wed 20-Feb-13 19:13:15
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
What is going on with Cab 16?
Openreach told me in December it needed power from other side of road and that work would happen in February. There were temporary traffic lights on Feb 7th for openreach work according to hereford council but a week later and the BT checker has gone from March 31st to, 'Sorry, you're not currently able to get BT Infinity...'
How can they not supply infinity to cab 16?
Standard User zyborg47
(eat-sleep-adslguide) Wed 20-Feb-13 21:57:35
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
In reply to a post by Katash:
Same issue with cab 71 - cab installed but no fan noise comming from it.


The fans are pretty quiet these days, so you may not hear them. the cabinet by me don't make a noise at all and the only time you can hear them is when the door is open.

Adrian

Desktop machine now powered by windows 7 pro 64bit , laptop by ubuntu

ALLPAY Wireless broadband
Standard User deleted
(deleted) Wed 20-Feb-13 22:44:03
Print Post

Re: More works in progress


[re: zyborg47] [link to this post]
 
the fans is like u get in pc
Standard User deleted
(deleted) Wed 20-Feb-13 22:46:04
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
Keep an eye on the checker, as its known to remove FTTC availability just before it goes live.
Its very likely that the power has been installed and the cabinet has been in testing and is soon to go live if everything is complete.

Infinity is just the BT retail name for their FTTC product, most people call it infinity as its the most advertised service at current.
Standard User deleted
(deleted) Wed 20-Feb-13 22:46:31
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
there is fttc cabinet at 16 saw it the other day
Standard User deleted
(deleted) Thu 21-Feb-13 10:54:15
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
Yes, there is a FFTC cabinet 16 in place and has been for months. Unfortunately there was apparently a power problem though, that required temporary traffic lights. These road works have now been completed but instead of taking orders the BT checker now says, �Sorry, you're not currently able to get BT Infinity. This may be because your area has not been enabled yet, or your individual line does not support super-fast broadband. Register your interest and we'll let you know if this changes�, and has done for the last couple of weeks.
The BT wholesale checker now says available 31 � Mar � 14
This is not unique to cabinet 16 though as I know of a number on the other side of town which is also waiting and their date has also changed from 31 � Mar � 13 to 31 � Mar � 14
It seems to me that the difficult cabinets are being knocked back until the end while they get the easier ones done. Hereford council road works schedule for openreach only shows work being carried out in Ledbury now.
Standard User deleted
(deleted) Thu 21-Feb-13 12:59:12
Print Post

Re: More works in progress


[re: deleted] [link to this post]
 
my cabinet number 73 been put back 3 times now it was going to be October then it was Dec now march 31 I bet it it will be put back until June when the time comes