|
Openreach have been installing cable this week on Lon Bach Awyr, leading up from the A4244 to Rhiwlas. I talked to one of the engineers, who said there were quite a few problems with collapsed and blocked channels, especially towards the Bangor end of the back road from Bangor to Pentir, via Caerhun. However, he was positive that FTTC cabinets were definitely going to be installed in Pentir and Rhiwlas, but could not give an indication of when.
|