Standard User adslmax
(knowledge is power) Tue 17-Dec-13 21:30:26
Print Post

Re: BT Cabinet Installing


[re: deleted] [link to this post]
 
Still no cabinet since Dec 10th - Dec 23rd. BT got 6 days left remaining to do it. I don't think it won't happen now until after xmas. Rather annoyed.

plusnetADSL2+16 Meg
Standard User deleted
(deleted) Tue 17-Dec-13 21:57:06
Print Post

Re: BT Cabinet Installing


[re: adslmax] [link to this post]
 
Still reckon the 23rd . Of course it dosnt really make much difference as it still won't be ready for a few months yet
Standard User adslmax
(knowledge is power) Tue 17-Dec-13 22:01:14
Print Post

Re: BT Cabinet Installing


[re: deleted] [link to this post]
 
In reply to a post by Ribble:
Still reckon the 23rd . Of course it dosnt really make much difference as it still won't be ready for a few months yet


They can't do this on the last day Dec 23rd because it say description here:

*********** ************ Telford, Telford And Wrekin
Works Start: 10 Dec
End: 23 Dec

Low impact, delays unlikely
Location : (PCP8), REAR OF ****************,TELFORD,SHROPSHIRE,TF7***
Description :
Install 11m of 1 way poly duct in Footway,
Install 3m of 1 way poly duct in Verge,
Install 18 metres of power duct in the footway,
Excavate for the base of the cabinet and perform excavation for earth rod/s,
pour the concrete, 3 days cure time,
set erection bolts for cabinet on template excavation for track
and lay BT duct. Erect the cabinet.
Excavation of the power hole (may have to dig back to prove power)
and lay power ducting complete the power connection Backfill and reinstate. site clear
Current status: Advanced planning

They need to pour the concrete for 3 days to cure time!

plusnetADSL2+16 Meg


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Tue 17-Dec-13 22:17:05
Print Post

Re: BT Cabinet Installing


[re: adslmax] [link to this post]
 
That would by Friday then to stand the cab on monday? Maybe they won't bother seeing as it's poets day .
Standard User adslmax
(knowledge is power) Tue 17-Dec-13 22:19:57
Print Post

Re: BT Cabinet Installing


[re: deleted] [link to this post]
 
It say work start Dec 10th and work end Dec 23rd. It's rather p****ed me off when openreach or contractor never bother to turn up. I had fired email make a formal complaint to openreach CEO about this.

plusnetADSL2+16 Meg

Edited by adslmax (Tue 17-Dec-13 22:20:37)

Standard User deleted
(deleted) Tue 17-Dec-13 22:35:58
Print Post

Re: BT Cabinet Installing


[re: adslmax] [link to this post]
 
What are you complaining about?
Administrator MrSaffron
(staff) Tue 17-Dec-13 22:38:25
Print Post

Re: BT Cabinet Installing


[re: deleted] [link to this post]
 
From the outside it looks like a child who has not got their way.

The scale of the FTTC roll-out is such that when the window for roadworks is applied for that delays or staffing levels at a sub contractor or Openreach can mean that work cannot go ahead.

Andrew Ferguson, [email protected]
www.thinkbroadband.com - formerly known as ADSLguide.org.uk
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Standard User Zarjaz
(knowledge is power) Wed 18-Dec-13 07:39:44
Print Post

Re: BT Cabinet Installing


[re: MrSaffron] [link to this post]
 
From the outside it looks like a child who has not got their way.

smile

Standard User adslmax
(knowledge is power) Wed 18-Dec-13 11:30:50
Print Post

Re: BT Cabinet Installing


[re: Zarjaz] [link to this post]
 
Got email from CEO Openreach this morning:

****************@openreach.co.uk

09:45 (1 hour ago)

Hi *****,



As promised more information.

Your cabinet PCP8 is planned to be stood tomorrow the 19th December and the power connection is appointed for Sunday the 22nd so if we are successful with both engineering activities we will be very close to progressing your cabinet to full completion and ready for service the 31st January 2014.



Thanks for your patience.



Regards

Olivia Garfield

Chief Executive, Openreach

Tel ***** ******

plusnetADSL2+16 Meg

Edited by adslmax (Wed 18-Dec-13 11:32:14)

Standard User deleted
(deleted) Wed 18-Dec-13 11:43:55
Print Post

Re: BT Cabinet Installing


[re: adslmax] [link to this post]
 
Are you going to ask her about the 3 day cure time smile