A lot of cabinets seem to be appearing without any planning mentions, Like the one in Merchants Park, Pembroke. What is concerning me now is that When I spoke to the guys that were working on PCP30 in Merchants Park, who were doing some preliminary works prior to the laying of Ducting and the installation of a cabinet they told me that PCP 29 was on their list for the following day, however since then 30 has had a fibre cab installed but Nothing has happened with 29, no ducting or base, no cabinet, I see many others going in - some only a couple of minutes walk from the exchange (beside the Ferry Lane Railway Bridge), but PCP 29 seems to have been forgotten, so the hope of a decent and stable service here seems to be receding slightly.
It is so frustrating - seeing the infrastructure going in all around me but not yet for the Cab that the wet string that serves my home is connected to. This line has always been difficult - even on dial up they had to tweak the gain because of issues when I moved here, and when Broadband came along (on the old Pipex 512 service) the line drops at varying intervals, sometimes several times in a day, and other times it will go for a couple of weeks without any issues, I had hoped for more than an average of 6 megs out of a line that is less than 3 Km in length. I'm hoping that if the issues persist after FTTC then it will add credibility to my theory that the issue lays in the loop between my home and the cabinet, and that might help me persuade Openjoke to finally get around to fixing a problem that has persisted for over 10 years,
|