Thanks.
So, to try and get this straight in my head, it does not matter that much where they put the external CSP provided that it is within 30 metres of where I want the internal ONT?
I presume they would be happy to run an external cable round the outside of the house to the point where the cable would enter the house as long it is within a maximum of 30 metres?
I am guessing it would be better to be present when they fit the CSP so that could be best positioned regards to where the ONT will be? Seeing they do not inform you when that first visit is going to take place that could be awkward.
Edited by Jax2 (Fri 27-Jun-14 23:03:58)