Well we was down for FTTP back in 2011 where they started to install the fibre, we even got to the stage where they fitted the fibre manifold in the pit and the enclosure up the pole.
Three and a bit years later still nothing and we are now down to not being viable even though half our road has it (i.e. 5 to 8 doors away), even though we was "Part of BT's 66% Commercial Plan", we are not even covered by the BDUK due to we get over the 2Mb speed and also the BDUK spread sheet says we covered by extensive commercial deployments, even though BT/OpenReach says we are not.
The guy across the road from us was told the other week that we are not viable for FTTP (even though we was back in 2011) but now might be for FTTC, I am fine with that, at least it would be better than what we currently get.
The annoying thing is that they have now put us at the back of the list and we have been told we will have to wait for the UK to be all fibred up before we get it, this is completely not fair, at the point where they got greedy and decided on making it not viable and moved us over to FTTC they should of started the process of the rollout for FTTC etc, not put us to the end of the list.
And to top that off we cannot even get VM here.
So we are now stuck with a rubbish slow BB connection that drops connection all over the place when it rains, we cannot even ask for an engineer to come out due to the time they come out its all dried up and working again until it rains again.
Our broadband speed is that slow its slower than 74% of the broadband connections of GB, now that is bad.