It used to tell me that 'Cabinet 7 is not currently...' or whatever, now the only info is the exchange. That is flagged as CS, as it has been for a year now, and happily tells me it will (might?) be connected in the next six months, with Sept 30th as the proposed date. We've watched that date jump up 3 months at a time.
There is a new cabinet, I've seen it for myself, and power has been connected at the beginning of June. My friends moved home just 4 miles from a 16/6 connection to get 1.2/0.3 and a promise that fibre was on it's way...
Virgin Cable (50/3)



Pages in this thread:
Print Thread
