The entry for the work on cabinet 58 on roadworks.org has ended. It appears some works just around 3 minutes walk away from the cabinet (and on the same road) have now been scheduled for 15 - 17 September, but right next to the cabinet 23 which from using the BT wholesale checker, already has FTTC enabled (although I may be incorrect). Description of the works is "Install 15m of 1 way poly duct in Footway,Install 15m of 1 way poly duct in Verge".
Is this an indication of anything, such as the fibre being blown through?