Well as I said days beforehand I watched OR pulling fibre thru and spoke to them so in theory the fibre is definitely done.
They said power was done because as I said it was 2 roads closed and 2 footpaths dug up so they said power was done at same time to minimise disruption on an A road.
Anyway suppose time will tell. The talk was the fibre was going back to holt which is about 4 miles instead of eacle which was under a mile. OR were out along the holt Road weeks in advance of cab build so I suspect that is what happened.