Well as I said days beforehand I watched OR pulling fibre thru and spoke to them so in theory the fibre is definitely done.

They said power was done because as I said it was 2 roads closed and 2 footpaths dug up so they said power was done at same time to minimise disruption on an A road.

Anyway suppose time will tell. The talk was the fibre was going back to holt which is about 4 miles instead of eacle which was under a mile. OR were out along the holt Road weeks in advance of cab build so I suspect that is what happened.
Standard User deleted
(deleted) Thu 13-Nov-14 09:25:44
Print Post

Re: New cab go live time?


[re: deleted] [link to this post]
 
I susspect you may seen the fibre spine work and/ or the blown fibre tubing work. The fibre,copper and power cannot be done until after the cabinet stand is completed, and usually some time after