My exchange, Comberbach (MRCOM) has been enabled for fibre, but my cabinet CAB 1 is showing as not yet enabled (on the BT checker). The BT site says it could be enabled in the coming weeks, but is that typical? Could it be weeks, or could it be longer? Do BT typically upgrade the CABs shortly after the main exchange?
Thanks in advance for any help



Print Thread
deleted