Well, if they keep postponing it doesn't matter whether I have a date or not.My point was at least you have a date that is being displayed i.e. they say you will be able to get Fibre possibly at that date, we don't even have that, even though BTO started installing it back in 2011 when the BTO Engineers was installing the hardware our end in the pit and up the pole, over 3 years later still no news, apart from what I have been told on here.
I could get a cheaper package when switching.
All we get displayed is that we can only get ADSL 2+ at best, which is better than nothing.
Paul



Pages in this thread:
Print Thread
