Torrington cab 8 is not complete, and work is ongoing.Ah that makes sense, every home apart from a few homes on cabinet 8 for Kingsmead has FTTC.
I don't think the previous poster meant Kingsmead (exchange)
I didn't read their whole reply where they displayed the speeds along with their exchange and cabinet, I was going by their original post was busy doing checks, while I will now stop
But yeah Cabinet 8 for exchange Torrington (WWTORR) is still in progress hence FTTC Planned (exchange ready 29th June 2013) Phase BDUK CDS 12a
I thought it was strange posting about a different exchange and cabinet, I have see it for cabinets of the same exchange.
Paul



Pages in this thread:
Print Thread
