What i'm finding curious at the moment that they are not starting the fibre from my exchange that i'm about 4 miles a way from (Martock, WWMART) but they seem to have started at closest and last Fibre Cabinet which is part of the Yeovil (WWYEOV) exchange in the other direction and live and from what i can see they are doing a cable run from there through my village to the Martock Exchange and i assume connecting the FTTC's along the way.
The reference numbers for roadworks.org for these cable runs end IBL10HAL1 all the way to IBL10HAL19 which is roughly where the Martock Exchange is.
Currently all the various checkers say "Exploring Solutions" or "under review" and at this stage i'm not so bothered about that progress is better than nothing
I'm not so bothered about why i'm on that exchange or this cab as there's no changing that really but curious perhaps from an infrastructure and logistics side.
My limited understanding of these things is that most exchanges (at least mine and the Yeovil one) are already fibre linked together which i believe is the 21CN status being enabled but maybe that's not the case?
Perhaps my question can't be answered unless BT/Openreach tell me which is highly unlikely even if i did ask. And there's no point in asking the contractors as they are just doing a job from point A to B.
If anyone can shed some light though that would be awesome!