I've been getting my hopes up for years now that fibre was coming to my postcode. I'm on Cab 210 in Winwick and is part of Connecting Cheshire rollout. It was originally phase 1, but is now one of the last to be done in Phase 3.
The reason Im being told that the cab is yet again on hold is there is a delay sourcing power to this cabinet.
Is this really possible? It was originally a TPON cab and so I believe that had power, and on both sides of it are streetlights?
Edited by kingbiscit (Wed 17-Jun-15 14:42:04)



Print Thread
kingbiscit