Infinity suggests you registered with BT Retail and nothing stopping them informing you that the date has slipped each time it slips, providers get given the schedules on the same equal basic by Openreach. If BT Retail were to somehow find out a specific reason and that information not be available to the other providers, then a legal team somewhere will be happy as lots of hours of work in court.
Truth be told the reality is problem like this - something (doesn't matter what) caused the cab to fall off the radar when originally in the plans, for commercial cabs as there is no missed contract penalties these are very much at the back of the list currently. For the BDUK project cabs, if there is a significant delay and other cabinets that can be delivered quickly elsewhere in the project area they will go ahead and do them.
Openreach do not care which cabinets are enabled so long as
1. Within budget
2. Contractual obligations get met
In a better world there would be more teams doing the work and spare teams on hand to deal with the cabs that hit snags and avoid ones constantly being pushed to the back of the list.
How open do we need them to be? After previous complaints about changing dates the cheapest solution was to stop talking about dates as much as possible.