Like Pauli1, I had a similar issue with records - where the post-order survey created a new record for my property, but held the wrong cabinet id. That allowed fibre orders to be placed, but the engineer would find it impossible to action whenever they turned up.
It took Plusnet around 3 months to sort out, and definitely needed complicated coordination between BTW and Openreach.
One of the final triggers to clearing the logjam was when an Openreach engineer was tasked with a "pair prove" - to just verify the actual connection points in the MDF, PCP and DP.



Pages in this thread:
Print Thread
