roadworks.org advised the following work is planned to erect a new PCP outside the exchange between the 19th and 25th September... assuming BT has the ability to go from build completed to RFS in 3 working days..
I guess sticking to schedule is not a concern as this work is now listed as 19th September to 2nd October, there is also another work scheduled between the 4th and 7th October to build yet another chamber...
Highway Authority: Wokingham Borough Council
Location: O/S 12/14, BROAD STREET.
Description: Build 1 concrete chamber 725mm x 255mm x 665mm deep in Footway,Install 2m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building