I'm 99% sure that the newly listed roadworks (and potentially the old one) are fibre-related. I recall reading somewhere that usually if a cabinet is abandoned in the 'connect' stage (on the Openreach "where and when" page) it's due to an issue with connecting the DSLAM (fibre) cabinet to the old PCP where the lines of properties are connected to.
Edit: Also seen a listing for "Install 130m of 1 way poly duct in footway and 8m in Carriageway" at the top of Pitchford lane.Typically this is used to carry and insulate the fibre cables, and the description suggests that it's going to cross a section of the road and continue down the footpath to the cabinet.
Edited by thebigdolphin1 (Thu 26-May-16 16:07:17)



Pages in this thread:
Print Thread
