I can see the following work being done in the area of that postcode:
Date: 3 Sep - 7 Sep
Location: IN FOOTWAY OPPOSITE RECTORY COTTAGE ON, MERE LANE...
Description: Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 2m of 1 way poly duct in Foo...
Date: 5 Sep - 13 Sep
Location: (PCP10) OUTSIDE 5 , REEVES WAY...
Description: Install 2m of 2 poly ducts in Footway,Install 3m of 2 poly ducts in Verge,Provide, Renew or Recover...
Date: 22 Aug - 5 Sep
Location: (PCP11) OUTSIDE 64 DONCASTER ROAD ON HARRIS ROAD TO SIDE OF 64 DONCASTER ROAD ON, HARRIS ROAD...
Description: Install 19m of 2 poly ducts in Footway,Provide, Renew or Recover 1 DSLAM street cabinet and base...
Date: 25 Aug - 5 Sep
Location: (PCP13) SIDE OF 96 , REEVES WAY...
Description: Install 2m of 2 poly ducts in Footway,Install 2m of 2 poly ducts in Verge,Provide, Renew or Recover...
Date: 22 Aug - 5 Sep
Location: (PCP14) OPPOSITE 1, WALSTOW CRESCENT...
Description: Install 2m of 2 poly ducts in Footway,Provide, Renew or Recover 1 DSLAM street cabinet and base...
Date: 12 Sep - 16 Sep
Location: (PCP20) OUTSIDE TELEPHONE EXCHANGE, CHURCH STREET...
Description: Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 13m of 5 poly ducts in Verge,Ins...
So I can see that they are installing the cabinet and installing 2 lots of 2m of fibre to it.
So I would say its possibly at the Build or Connect Stage, so possibly a few Months left to go, but don't quote me on that.
Paul