General Discussion
  >> Fibre Broadband


Register (or login) on our website and you will not see this ad.


Pages in this thread: 1 | [2] | 3 | (show all)   Print Thread
Standard User deleted
(deleted) Tue 22-Nov-16 16:01:55
Print Post

Re: 95% of UK to get Ultra fast Broadband by 2020


[re: kebabselector] [link to this post]
 
the Gap required would be less now than what it was -- depends if you want to do anything abgut -

your developer chose to provide only copper lines
Standard User deleted
(deleted) Tue 22-Nov-16 16:03:03
Print Post

Re: 95% of UK to get Ultra fast Broadband by 2020


[re: deleted] [link to this post]
 
the 2020 is 30 mbps - or what that a deliberate mistyope from you !!!!
Standard User deleted
(deleted) Tue 22-Nov-16 16:04:34
Print Post

Re: 95% of UK to get Ultra fast Broadband by 2020


[re: Chrysalis] [link to this post]
 
what utter and compete rubbish 3.5bn spend and business gets lambasted

none else is going to spend any money !!!!


Register (or login) on our website and you will not see this ad.

Administrator MrSaffron
(staff) Tue 22-Nov-16 16:15:52
Print Post

BBC Quote is wrong


[re: deleted] [link to this post]
 
Play the audio and you will find the chairman did not say 95% ultrafast.

The interruptions appear to have lead to write up leading to a miss quote.

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Standard User ian72
(eat-sleep-adslguide) Tue 22-Nov-16 16:18:47
Print Post

Re: BBC Quote is wrong


[re: MrSaffron] [link to this post]
 
I listened earlier and he does say the word "ultrafast" but it is whilst the interviewer is talking over him. However, the quote they have given was not directly stated and therefore should not have been in quotation marks.

EDIT : At 30 seconds he seems to say "that more than 95% will have ultrafast" but I don't think it is directly linked to a date.

EDIT 2 : OK another listening from 27 seconds and he does say "by 2020 we'll have more than 95% will have ultrafast"

Edited by ian72 (Tue 22-Nov-16 16:22:35)

Administrator MrSaffron
(staff) Tue 22-Nov-16 16:28:39
Print Post

Re: BBC Quote is wrong


[re: ian72] [link to this post]
 
All hinges on whether you hear

"by 2020 we'll have more than 95% will have ultrafast"
or
"by 2020 and we'll have ultrafast" and the interview shifts so he seems to not give an ultrafast coverage figure.

It is messy at that point in the interview when trying to decipher via a low bit rate news feed

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Administrator MrSaffron
(staff) Tue 22-Nov-16 16:30:02
Print Post

Re: BBC Quote is wrong


[re: MrSaffron] [link to this post]
 
Did chase BT press office, and the 95% was about existing targets and with interruption between sentences things are now all confused.

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Standard User ian72
(eat-sleep-adslguide) Tue 22-Nov-16 16:45:16
Print Post

Re: BBC Quote is wrong


[re: MrSaffron] [link to this post]
 
If the interviewer hadn't been talking over him and actually let him answer it may have been clearer.
Standard User kasg
(knowledge is power) Tue 22-Nov-16 16:55:04
Print Post

Re: BBC Quote is wrong


[re: MrSaffron] [link to this post]
 
In reply to a post by MrSaffron:
Play the audio and you will find the chairman did not say 95% ultrafast.

He said "by 2020, we'll have, you know, more than 95% will have ultra-fast ..." at 0:29 then John Simpson started talking over him.

Kevin

plusnet Unlimited Fibre Extra - sync 66999/19999 (banded) at around 450m - BQM
Using OpenDNS
Domains and web hosting with TSOHOST
Standard User deleted
(deleted) Tue 22-Nov-16 18:01:02
Print Post

Re: BBC Quote is wrong


[re: kasg] [link to this post]
 
In reply to a post by kasg:
In reply to a post by MrSaffron:
Play the audio and you will find the chairman did not say 95% ultrafast.

He said "by 2020, we'll have, you know, more than 95% will have ultra-fast ..." at 0:29 then John Simpson started talking over him.


I'm with this interpretation.

To be clear, the use of the word "ultrafast" is at a much lower volume, in mid-stutter, and was said (by Michael Rake) while John Humphrys was talking over him - insistent on getting an answer to the question of "when?", but missing the potentially ground-breaking announcement happening in front of him!

The reduction in volume and the stutter, part way through the sentence, suggests to me that Michael Rake's attention had moved onto John Humphrys' interruption/question but his mouth was just filling in the gap.

If he had been left to continue his direction of thought, I think he's likely to have recognized he misspoke. But we'll never know, because John Humphrys didn't have the patience to listen and explore the subject.

The listener can be left to decide whether aggressive questioning ever actually gets the answer you wanted to hear.
Pages in this thread: 1 | [2] | 3 | (show all)   Print Thread

Jump to