there are some as pert of London extension programme in Bermondsey but they 4/5 km from exchange
Imost EO lines will be short in no docks exchanges as exchange are tends to be quite defined (iwrth the odd exzception)
BT are also finishing off some of the partly installed commercial installs in the London area, our FTTP that was originally started back in Dec 2011 which was put on hold due to build issues, we think BT had forgotten about it but after a letter from my local MP and a nice email from me to the chairman's office at BT, it was finished off last month still as part of the commercial upgrade and not part of the LEP.
Sadly this was only for the lines on our phone pole.
There is however 3 cabinets on our exchange being upgraded to FTTC that is part of LEP, and one of those (I think) is an all in one cabinet for a block of EO Lines not far from our exchange.
Paul



Pages in this thread:
Print Thread
