Thank you Paul
Yes the exchange does look like a converted brick shed
Most of the houses are either old thatched cottages, 10 plus years old "executive homes" or converted pub, school etc.
Going by P1s postcode, where it is shown on Code Look is about as close as it can be as the crow flies.
What is odd to me, is that there does not appear to be planned roadworks in the area in the next 12 months.
Maybe the fibre cabinet has been installed and is just waiting for the cabling and due to issues its been put on hold?
At the location it says the cabinet should be, is there anything?
As for nothing on the roadworks site for the next 12 months, might be right, but I have seen in my area work that just pops up to be done in the next week or so right up to being several months, so it can happen.
What you also need to understand, only stuff that require planning will show up, so if no road or pavement closure or digging up stuff, it might not even show up on roadworks.
I know a chamber down our road had o be enlarged to the new common sized one, this required the pavement to be closed off and bollards to be put up in the road for pedestrians to safely walk around it, this work was on roadworks 4 times before it was actually done.
Now the work at our Splitter Node (i.e. the re-splicing of all the fibres) which is located the bottom of our road on the corner wasn't even listed on the roadworks site.
So like I said not everything is.
The connecting of power and actual fibre cables should be though.
Paul