Agreed our exchange LNILC (Ilford Central) had the following:
Phase 05b 2011
Phase 10a 2013
Phase 11b 2013-2014
Phase LEP PLUS 15b
Phase LEP 16b
Phase LEP 17a
And the LEP 17a is down to be completed April this year.
I can also see down the road from me that they are moving another PCP cabinet 230m (other side of a block of flats) due to there was no space to re-shell the PCP where it was and also install a FTTC, whereas the new location there is plenty of space.
In fact it now seems that everyone else on my exchange have jumped 2 stages to the Design Stage with the following message:
You're in a fibre plan and we're looking at the existing network in your area to see how we will design the upgrade.
You can't order a fibre service today but typically it'll be available to your premises within the next 12 months.
Find out more about the fibre journey.
So at least they have come back to do stuff on my exchange.
Not seen any more LEP Phases as yet, but this is early days.
A lot of the FTTP areas listed on codelook haven't got fibre due to they run out of E Side fibres so I have been told.
But its good to see non BDUK areas getting more stuff done at last.