In reply to a post by Chippy_Tea_:I understand Openreach want all but the headends gone by 2025 ish.
Which would need the vast majority on some sort of street based fibre or full fibre connection.
I have already googled G.fast today whats a headbend?
.
Not all FTTC cabs terminate at the nearest exchange (often too small), they will terminate at a headend exchange which is the nearest main (major) exchange. In my case nearest exchange is Inverness Culloden (NSICL) which is just the road from where I live, however fibre connections in my area (both FTTC & FTTP) all terminate at the main (headend) exchange in town, Inverness Macdhui (NSIMD).
edit: beaten to it by lee111s
Edited by deleted (Mon 14-Aug-17 20:43:09)



Pages in this thread:
Print Thread
deleted