(deleted) Fri 25-Aug-17 19:29:59
Print Post

Re: Kentish Town Exchange Cabinet 29


[re: deleted] [link to this post]
 
Some promising news!

The BT Wholesale checker at https://www.btwholesale.com/includes/adsl/main.html still says, �At this time we cant [sic] provide a delivery date for this cabinet.� However, the Openreach checker at https://www.homeandwork.openreach.co.uk/when-can-i-g... now reports that my cabinet is further along the �Fibre Journey�.

Previously, checks for my number returned �we are exploring solutions� (which I understand means �we are not exploring solutions�) but now the result is �field survey�. This is the fourth stage after �in scope� and �design� (�Superfast accepting orders� is the eighth stage). According to the site, fibre will typically be available within nine months. Given that at one point I was told I would be able to get fibre in September 2014, I�m not holding my breath, but progress is progress.

I checked the council�s website for planning applications but couldn�t find anything yet.
Standard User deleted
(deleted) Sat 26-Aug-17 13:00:37
Print Post

Re: Kentish Town Exchange Cabinet 29


[re: deleted] [link to this post]
 
It looks like 5 cabinets on Kentish Town are all in the same state, having been added as part of "LEP Phase 19b", and all due April 2018.
Standard User deleted
(deleted) Sun 31-Dec-17 18:59:24
Print Post

Re: Kentish Town Exchange Cabinet 29


[re: deleted] [link to this post]
 
Good news! Kentish Town Exchange Cabinet 29 is now accepting orders for fibre!

In roughly early November (or maybe late October, I forget), I noticed that the Openreach checker had moved along one stage to �build�. I still wasn�t able to find any planning applications on the council�s website, so I figured we could still be in for a bit of a wait.

However, in mid-November, I was walking close to where the existing cabinet is situated and saw some orange construction barriers protecting an object looming in the shadows behind. I walked over to get a closer look (it was dark) and confirmed that it did appear to be a fibre cabinet. A sign from KN Group working on behalf of Openreach apologised for the inconvenience and said works were taking place between November 16th and November 29th. The permit number included the promising-sounding characters �KNTSHTWN29�. I checked online and found information confirming that the works were to install a fibre cabinet and connect it to power. I initially assumed I hadn�t found any planning information prior to this because it was outside the conservation area and did not require permission, but I just checked and apparently it is within the conservation area, so I�m not entirely sure what�s going on there.

The next time I checked the checker, it had moved on to the next stage, �connect�.

In early December, I was walking past the site again and saw that the orange barriers were gone and the installation appeared to be complete. I did notice what looked like some fibre optic cables sticking out of the bottom of the closed doors, so I thought perhaps there was some more connection work to do.

Going on WWWombat said, I assumed we were probably still a few months away from fibre being available. But a couple of weeks ago, I checked the checker anyway (I thought perhaps it might have nudged along to the penultimate �activate� stage) and was shocked (in a good way) when it returned �Superfast accepting orders�.

So I placed an order with my ISP. My activation date is January 5th and my forecast speeds are 67�80Mbps down and 19�20Mbps up.


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Fri 05-Jan-18 16:01:37
Print Post

Re: Kentish Town Exchange Cabinet 29


[re: deleted] [link to this post]
 
My line was regraded from ADSL to VDSL this morning. I�m getting approximately 74Mbps down and 18.5Mbps up.

Worth waiting seven years for!